• Home
  • Contact
  • Privacy Policy
  • Disclaimer
  • DCMA
  • Terms
  • cancer science review

    Home » Galant , work station » Galant Standing Desk with Monitor Shelf

    Galant Standing Desk with Monitor Shelf

    Posted by Unknown Posted on 8:44 AM with No comments

    Materials: Galant 160x80cm Desk with Frame, Galant 80x60cm Extension Table with Frame (2), Galant T-Leg (2), 8" Capita Legs (2), Ekby Hemnes 119x28cm Shelf, 1' Long 3/8" Threaded Rod (4), 3/8" Hex Nut (4)

    Description: Inspired by Steev Kelley's two-level Galant hack, I set out to create my ideal standing desk.

    This design provides a 160x80cm upper desk, a 160x60cm lower shelf and a 119x28cm monitor shelf.

    I had a lot of fun thinking this out and figuring out what pieces to use. Thanks again to Steev for the original concept.



    Step 1 - Assembling the lower frame

    In order to match the width of the lower shelf to the upper shelf and still keep it out of the way of my legs, I used two 80x60cm extension tables (901.052.67) and matching extension frames (100.568.88) connected lengthwise.

    My intent was to connect the two extension frames to one another and expand them to match the 160x80 frame on the upper desk, but I underestimated the ability of the extension frames to extend that far. By drilling my own holes in the extension bars and using metal screws, I was able to accomplish what I had set out to do, but I recommend an 80x60cm table frame (200.805.57) and the extension frame (100.568.88) for anyone else wanting to duplicate this.

    Step 2 - Prepare the lower shelf for the upper desk supports

    Unpack the two extension tables (901.052.67) and place them bottom-up and lengthwise to create a 160x60cm surface. The arrangement should be such that the pre-drilled holes will line up with the screw holes in the lower frame. Lift the lower frame up onto the extension tables to verify this and adjust the arrangement of the tables as required, but do not attach the lower frame yet.

    Once this is done, go to each end of the lower frame and locate the holes where A-legs would normally be attached. These are located 7cm from the edge of the frame on either side of where the T-legs are to be mounted. Use a pencil to mark the corresponding location on the bottom of the extension tables. Then, remove the frame and use a 3/8" drill bit to bore holes through the extension tables where the marks were drawn.

    Step 3 - Assemble the lower shelf

    Attach the T-legs to the lower frame and attach the lower frame to the extension tables per the Galant instructions. When complete, set the lower shelf on its legs.

    Step 4 - Create the supports

    Open the first box of Capita legs (200.495.38) and remove the legs and four plastic caps.

    Remove the base from each leg. They are snug and it can sometime take a bit of effort to detach them. Use the 3/8" drill bit again to bore a hole in the centre of each base. Clean off any excess plastic and re-attach the bases to the legs.

    Insert a threaded rod into the base of each leg and screw it into the upper thread so that 9cm (3.5") of rod protrudes from the base. Screw the plastic cap provided onto the threaded rod at the top of each leg.

    Step 5 - Attach the support to the lower shelf

    Place one of the supports in each of the drilled holes in the lower shelf. The threaded rod at the bottom should protrude through the A-leg holes in the lower frame. Secure each rod to the lower frame with a 3/8" nut.

    Step 6 - Attach the upper frame to the supports

    Place the upper frame (000.568.84) onto the supports using the same A-leg holes. Secure the upper frame to the supports with 3/8" nuts and tighten both the upper frame nut and lower frame nut to the point where the Capita leg will not turn. Be careful that the threaded rod does not extend beyond the thickness of the upper frame's nut.

    Once complete, use a grinder tool to cut off the excess threaded rod below the lower nut.

    (Note: A 10" long 3/8" bolt might also be sufficient to assemble the supports without the mess of grinding off the threaded rod, but I haven't actually tried this.)

    Step 7 - Attach the upper desk to the upper frame

    Attach upper desk to the upper frame per the Galant instructions.

    Step 8 - Assemble the monitor shelf

    Open the other package of Capita legs and attach them to the four corners of the Ekby Hemnes (301.798.74) shelf. Place the assembled shelf toward the back of the upper desk.

    ~ Jody Lemoine, Niagara-on-the-Lake, Ontario, Canada
    FACEBOOK DIGG TWITTER GOOGLE+ LINTASKAN STUMBLEUPON

    Newer Post Older Post
    Powered by Blogger.

    Popular Posts

    • Up the bed
      Materials: Kura + Grankulla Description: Basically I open the structure of the sofa Grankulla and put to Kura bed on it. I cut the excess wo...
    • Cancer - What is opioids cancer pain
      ctSearch Results Original Query Cancer - What is opioids cancer pain Search Results cancer opioids cancer pain Cancer is a term for disease...
    • What is cancer GAD?
      ctSearch Results Original Query What is cancer GAD? Search Results cancer gad GAD is a condition marked by excessive worry and feelings of ...
    • Cancer - What is 6 cm
      ctSearch Results Original Query Cancer - What is 6 cm Search Results cancer 6 cm Preview N3: Cancer found in lymph nodes is larger than 6 c...
    • Cancer - What is Mark cancer survivors kinds
      ctSearch Results Original Query Cancer - What is Mark cancer survivors kinds Search Results cancer mark cancer survivors kinds Preview Newl...
    • DiY Expedit Wine Rack
      Materials: Expedit 2X1, 4" PvC Pipe, Under Cabinet Drinkware Holder Description: I wanted a small, contemporary wine rack to hold my mo...
    • Princess throne
      Photo: IK EA.com Materials: MAMMUT child chair Description: The backrest is made out of solid metal and polystyrene. Been glued to paper (...
    • What is cancer plasmacytic?
      ctSearch Results Original Query What is cancer plasmacytic? Search Results cancer plasmacytic Preview A primary poorly differentiated invas...
    • Lift door Faktum for TV
      Materials: Faktum: 3 elements 60 x 70 (35cm deep), 3 elements 60 x 70 (60cm deep), 2 elements 80 x 70 (60 deep), 2 elements 30 x 70 (60 deep...
    • What is cancer ISIS 5132?
      ctSearch Results Original Query What is cancer ISIS 5132? Search Results cancer isis 5132 ISIS 5132 is a substance that is being studied in...

    Blog Archive

    • June (81)
    • July (100)
    • August (94)
    • September (74)
    • October (456)
    • November (275)
    • December (178)
    • January (257)
    • February (176)
    • March (185)
    • April (191)
    • May (207)
    • June (114)
    • July (223)
    • August (116)
    • September (71)
    • October (152)
    • November (49)
    | Contact | Privacy Policy | Disclaimer | DCMA | Terms |
    Copyright © 2013. cancer science review - All Rights Reserved
    Designed By Latest K-Pop News And bloggerspherepedia
    Proudly Powered By Blogger